I'm hoping the next couple days will be productive as I have some last minute tasks to finish up. Everything is coming together nicely and hope to get in the water next weekend for a shake down.
To do list:
- Check masthead and sheaves
- Inspect all clevis pins and retainer rings
- Remove, inspect and reseal chainplates
- Service winches
- Repair or replace bow eye
2 comments:
Can you post the specs on the halyards and sheets from D&R Marine?
I need to order the exact same set, and would like to know more.
These measurements are for 1971-1978 masthead rigs with the mainsheet system that connects to a triangle plate on the backstay.
The main and jib halyards are both 5/16" sta-set 50' in length. (purchased from D&R)
The main sheet is 5/16" sta-set 40' in length. (purchased on ebay)
The boom vang is 1/4" sta-set 10' in length. (purchased on ebay)
Hope that helps...
Post a Comment